Master Plan Auditor
Read-only analysis of MASTER_PLAN.md and beads issues. Provides recommendations with confidence scores.
Philosophy: User confirmation = done. Tests passing and commits existing are evidence, not proof.
Quick Start
/audit-tasks
Features
| Feature | Description |
|---|---|
| IN_PROGRESS Analysis | Parse all IN_PROGRESS tasks, gather git/test evidence, calculate confidence score |
| Status Sync Checker | Verify all 3 MASTER_PLAN.md locations match (table, header, status line) |
| Stale Task Detector | Flag tasks with no git activity for 7+ days |
| Beads Cross-Reference | Compare MASTER_PLAN.md vs beads issues, find mismatches |
| Orphan Finder | Task IDs in git/code but not in MASTER_PLAN.md |
Workflow
Step 1: Parse MASTER_PLAN.md
Read docs/MASTER_PLAN.md and extract all tasks with their statuses from all 3 locations.
Location Detection Patterns
Location 1: Summary Table
| **TASK-XXX** | Feature Name | Priority | 🔄 **IN PROGRESS** | ... |
| ~~**TASK-XXX**~~ | ✅ **DONE** Feature Name | Priority | ✅ **DONE** (date) | ... |
Regex pattern:
\| \*\*(?:~~)?(?<id>TASK-\d+|BUG-\d+|ISSUE-\d+|ROAD-\d+|IDEA-\d+)(?:~~)?\*\* \|
Location 2: Subtasks/Bullet Lists
- TASK-XXX: Description
- ~~TASK-XXX~~: ✅ Description (completed)
Regex pattern:
^[-*] (?:~~)?(?<id>TASK-\d+|BUG-\d+|ISSUE-\d+|ROAD-\d+|IDEA-\d+)(?:~~)?:
Location 3: Detailed Section Headers
#### TASK-XXX: Title (🔄 IN PROGRESS)
#### ~~TASK-XXX~~: Title (✅ DONE)
Regex pattern:
^#{3,4} (?:~~)?(?<id>TASK-\d+|BUG-\d+|ISSUE-\d+|ROAD-\d+|IDEA-\d+)(?:~~)?:.*\((?<status>[^)]+)\)
Status Detection (Priority Order)
| Pattern | Detected Status |
|---|---|
~~ wrapping ID | done |
DONE, FIXED, COMPLETE, ✅ | done |
REVIEW, MONITORING, 👀 | review |
IN PROGRESS, IN_PROGRESS, 🔄 | in_progress |
PAUSED, ⏸️ | paused |
PLANNED, 📋 | planned |
| Default | planned |
Step 2: Gather Evidence for IN_PROGRESS Tasks
For each task that is NOT done:
# Count commits mentioning task
git log --oneline --all --grep="TASK-XXX" | wc -l
# Get last activity date
git log -1 --format=%ci --all --grep="TASK-XXX" 2>/dev/null || echo "never"
# Check for completion keywords in recent commits
git log --oneline --all --grep="TASK-XXX" | head -5 | grep -iE "(fix|implement|complete|done|finish|close)" || true
# Check if related tests exist
grep -r "TASK-XXX\|$(echo 'Feature keywords')" tests/ src/ --include="*.spec.ts" --include="*.test.ts" -l 2>/dev/null | head -3
Step 3: Calculate Confidence Scores
Confidence Score (0-100) - Higher = more likely done:
| Evidence | Points |
|---|---|
| Commit message contains "fix/implement/complete/done" | +30 |
| 3+ commits mentioning task | +20 |
| Related beads issue is closed | +25 |
| Related tests exist | +15 |
| Activity within last 2 days | +10 |
Interpretation:
- 70-100: Likely done (recommend verification)
- 40-69: Possibly done (needs investigation)
- 0-39: Still in progress
Step 4: Check Status Sync Across Locations
Compare status in all 3 locations for each task:
# Get all occurrences of a task ID
grep -n "TASK-XXX" docs/MASTER_PLAN.md
Mismatch examples:
- Table says
🔄 IN PROGRESSbut header says(✅ DONE) - ID has
~~strikethrough~~but status column saysPLANNED - Bullet says
✅but detailed section saysPAUSED
Step 5: Detect Stale Tasks
Tasks with no git activity for 7+ days:
# Get days since last activity
last_commit=$(git log -1 --format=%ct --all --grep="TASK-XXX" 2>/dev/null)
now=$(date +%s)
days_ago=$(( (now - last_commit) / 86400 ))
if [ $days_ago -gt 7 ]; then
echo "STALE: TASK-XXX - $days_ago days since last activity"
fi
Step 6: Cross-Reference Beads
# List all open beads issues
bd list --status=open 2>/dev/null || echo "Beads not available"
# List closed beads issues
bd list --status=closed 2>/dev/null || echo "Beads not available"
# Compare with MASTER_PLAN status
Mismatch Types:
- Beads OPEN + MASTER_PLAN DONE = "Beads issue should be closed"
- Beads CLOSED + MASTER_PLAN IN_PROGRESS = "Task may be done"
Graceful Degradation: If beads returns an error (repo ID mismatch, not initialized), output:
⚠️ Beads unavailable: [error message]
Skipping beads cross-reference. Other checks continue.
Step 7: Find Orphan Task IDs
Task IDs mentioned in git but not in MASTER_PLAN.md:
# Get all task IDs from git history
git log --oneline --all | grep -oE "(TASK|BUG|ISSUE|ROAD|IDEA)-[0-9]+" | sort -u > /tmp/git-tasks.txt
# Get all task IDs from MASTER_PLAN.md
grep -oE "(TASK|BUG|ISSUE|ROAD|IDEA)-[0-9]+" docs/MASTER_PLAN.md | sort -u > /tmp/plan-tasks.txt
# Find orphans (in git but not in plan)
comm -23 /tmp/git-tasks.txt /tmp/plan-tasks.txt
Output Report Format
# Task Audit Report
**Generated**: [timestamp]
**MASTER_PLAN.md**: docs/MASTER_PLAN.md
**Beads Status**: [Available/Unavailable]
## Summary
| Category | Count |
|----------|-------|
| Likely Done (needs verification) | X |
| Still In Progress | X |
| Stale (>7 days) | X |
| Status Inconsistencies | X |
| Beads Mismatches | X |
| Orphan IDs | X |
---
## Likely Done (Confidence ≥70)
These tasks have strong evidence of completion. **User verification required.**
### TASK-XXX: [Title]
| Metric | Value |
|--------|-------|
| Confidence | 85/100 |
| Last Activity | 2 days ago |
| Commits | 5 |
| Beads | Closed |
**Evidence:**
- Commit `abc123`: "fix: implement TASK-XXX feature complete"
- Tests exist: `tests/feature.spec.ts`
- Beads issue #42 closed on 2026-01-23
**To mark done:**
```bash
# Update all 3 locations in MASTER_PLAN.md:
# 1. Table: | ~~**TASK-XXX**~~ | ✅ **DONE** ... |
# 2. Bullet: - ~~TASK-XXX~~: ✅ ...
# 3. Header: #### ~~TASK-XXX~~: ... (✅ DONE)
# Then close beads (if open):
bd close [beads-id]
Still In Progress
These tasks show ongoing work.
TASK-YYY: [Title]
| Metric | Value |
|---|---|
| Confidence | 35/100 |
| Last Activity | Today |
| Commits | 2 |
Recent commits:
def456: "wip: TASK-YYY initial setup"
Stale Tasks (>7 Days)
No git activity detected. Consider: resume, pause, or mark done.
| Task | Days Stale | Last Activity |
|---|---|---|
| TASK-ZZZ | 14 days | 2026-01-11 |
Recommendations:
- Resume work → update status to
🔄 IN PROGRESS - Pause → update status to
⏸️ PAUSED - Already done → verify with user, then mark
✅ DONE
Status Inconsistencies
These tasks have different statuses in different locations.
TASK-AAA
| Location | Line | Status Found |
|---|---|---|
| Table | 45 | 🔄 IN PROGRESS |
| Header | 312 | (✅ DONE) |
Fix: Update line 45 to match line 312 (or vice versa).
Beads Mismatches
MASTER_PLAN.md and beads show different statuses.
| Task | MASTER_PLAN | Beads | Resolution |
|---|---|---|---|
| TASK-BBB | ✅ DONE | OPEN | bd close [id] |
| TASK-CCC | 🔄 IN PROGRESS | CLOSED | Verify if done |
Orphan Task IDs
Found in git history but not in MASTER_PLAN.md.
| Task ID | Commit | Suggestion |
|---|---|---|
| TASK-999 | abc123 | Add to MASTER_PLAN.md or archive |
Next Steps
- Verify likely-done tasks with user, then run
/done TASK-XXX - Fix inconsistencies by updating all 3 locations
- Sync beads with
bd closecommands shown above - Resume or close stale tasks based on project priorities
---
## Important Rules
1. **NEVER auto-mark tasks as done** - Only provide recommendations
2. **User confirmation is required** - Tests/commits are evidence, not proof
3. **Check all 3 locations** - Table, bullets, detailed headers
4. **Graceful degradation** - If beads fails, continue with other checks
5. **Confidence scores guide priority** - High confidence = verify first
---
## Stale Threshold Configuration
Default: 7 days
The stale threshold can be mentioned in the audit request:
/audit-tasks --stale-days=14
---
## Integration with Other Skills
| Skill | How Auditor Relates |
|-------|---------------------|
| `/done` | Auditor recommends, `/done` executes the marking |
| `/dev-maestro` | Both parse MASTER_PLAN.md, use same patterns |
| `/smart-doc-manager` | For MASTER_PLAN.md structural updates |
---
## Troubleshooting
### Beads Error: "repo ID mismatch"
⚠️ Beads unavailable: Repository ID mismatch
This means the beads database was created for a different repo. The auditor will skip beads cross-reference and continue with other checks.
### No Git History for Task
If a task has no commits mentioning it:
- Confidence: 0
- Status: Based on MASTER_PLAN.md text only
- Recommendation: Verify manually
### Parser Missed a Task
If a task exists but wasn't found:
- Check the section header format
- Ensure task ID format matches: `TASK-XXX`, `BUG-XXX`, etc.
- Verify the section is a recognized type (Roadmap, Active Work, etc.)